| Remote Manifold-7 at West Kuwait |
 |
KOC |
EPC |
Kuwait |
2024 |
| Engineering, Procurement And Construction and Commissioning of Debottlenecking of Coker Unit (U-20) MAB |
 |
KNPC |
EPC |
Kuwait |
2023 |
| Procurement, Construction And Commissioning Of Automatic Backwash Filter Package (1 Nos.) On 72 Inch Sea Water Supply Lines At MAA Refinery |
 |
KNPC |
EPC |
Kuwait |
2023 |
| Replacement Of Dosing And Wash Water Make-Up Pumps (33 Nos.) / Travelling Water Screen (Ts-73-101 A/B)& Screen Wash Pumps (P-73-106 A&B) / Overhead Gas After Cooler (E-12-122) In MAB Refinery |
 |
KNPC |
EPC |
Kuwait |
2022 |
| Engineering, Procurement, Construction and Commissioning of KOC Molten Sulphur Handling Facilities at KNPC MAA Refinery |
 |
KNPC |
EPC |
Kuwait |
2020 |
| EPC and Commissioning of the Balance Activities for New AGRP Project at MAA Refinery |
 |
KNPC |
EPC |
Kuwait |
2019 |
| Engineering, Procurement and Construction of New Flare Gas Recovery Unit (Unit- 49) at MAB Refinery |
 |
KNPC |
EPC |
Kuwait |
2018 |
| Replacement of Valves in MAB Refinery |
 |
KNPC |
EPC |
Kuwait |
2017 |
| Replacement of HIC affected Non-NACE Separators and Gas Scrubbers at SEK GCs 1,6,8 & 11 |
 |
KOC |
EPC |
Kuwait |
2017 |
| Replacement of the HIC affected equipment in SK GC's 3,4,7,8 and 21 |
 |
KOC |
EPC |
Kuwait |
2017 |
| Revamp of MAA Burney for Recovery and Smokeless Operation |
 |
KNPC |
EPC |
Kuwait |
2017 |
| Design , Fabrication & Erection of New Incinerator Stacks (2 Nos) of 110M height at TGTU (Unit 24) at MAB Refinery |
 |
KNPC |
EPC |
Kuwait |
2013 |
| Engineering , Procurement & Construction of New Flare Gas Recovery Unit (Unit- 105) At Mina Ahmadi refinery |
 |
KNPC |
EPC |
Kuwait |
2013 |
| Facilities for Moisture Control & Dehazing of Gas Oil, Mina Abdulla, KNPC |
 |
KNPC |
EPC |
Kuwait |
2008 |
| Upgrading of MCO (Medium Crude Oil) Incoming Manifold at GC -27 |
 |
KOC |
EPC |
Kuwait |
2013 |
| EPC for Revamp of Potable Water Network at MAB Refinery |
 |
KNPC |
EPC |
Kuwait |
2009 |
| Installation of Gravity Drain System in GCs 17,27 & 28 |
 |
KOC |
EPC |
Kuwait |
2010 |
| Replacement of Existing CS piping by PTFE Lined CS piping-Shuaiba Refinery |
 |
KNPC |
EPC |
Kuwait |
2008 |
| Improving Maintainability of Trim Coolers & Desalter Dehydration Heaters at GC - 27 & 28 West Kuwait |
 |
KOC |
EPC |
Kuwait |
2010 |
| Extension of Glass Factory, EPC Contract. |
 |
Gulf Glass Manufacturing Company |
EPC |
Kuwait |
2002 |
| Construction of Marrat Water Flood Pilot Plant, Kuwait Oil Company |
 |
Al Khorayef/KOC |
EPC |
Kuwait |
2006 |
| Replacement of Fire Protection System of Mina Crude Pump units 1 & 2 |
 |
KOC |
EPC |
Kuwait |
2010 |
| Construction of Wara Water Flood Pilot Plant, Kuwait Oil Company |
 |
Al Khorayef/KOC |
EPC |
Kuwait |
2005 |
| Engg, Procurement and Construction of 7 Nos of 1000 Cu.m of Lube Oil Storage tanks |
 |
Kuwait Lube Oil Company |
EPC |
Kuwait |
2002 |
| Dry Gas Seal System Retrofitting For Compressors C-84-100 & C-84-200 at MAA Refinery |
 |
Dan Trading/KNPC |
Construction |
Kuwait |
2022 |
| EU1/EU2 C2 OSBL Line Civil Revamp Project |
 |
EQUATE |
Construction |
Kuwait |
2022 |
| MEI Works for the Process Sub-Area of the EPC&C of Gas Train 5 Project at MAA Refinery |
 |
Tecnicas Reunidas/ KNPC |
Construction |
Kuwait |
2022 |
| SP-1, SMP2 & 3 Structural, Mechanical and Piping Works, CFP MAB Refinery |
 |
HHI/KNPC |
Construction |
Kuwait |
2019 |
| Construction of Mechanical, Structure, Piping, Electrical, Instrumentation & Telecom Works for New Gathering Center, GC-29 in North Kuwait |
 |
Petrofac/KOC |
Construction |
Kuwait |
2018 |
| Prefabrication of Piping Spool for LFHO project, KOC |
 |
Petrofac/KOC |
Construction |
Kuwait |
2017 |
| Pre Commissioning and Commissioning Activities Of Boiler No. 8 and Associated Facilities For NAGRP Project at MAA Refinery |
 |
KCC/KNPC |
Construction |
Kuwait |
2016 |
| Installation of New Compressor at GC-7, GC-8 & GC-21 |
 |
Saipem/KOC |
Construction |
Kuwait |
2012 |
| EBSM Project, ME&I Works, OL2K Project, The Kuwait Styrene Company (TKSC). |
 |
The Kuwait Styrene Company (TKSC) |
Construction |
Kuwait |
2008 |
| Olefins – OL2K, Mechanical Infrastructure , M1 package, Equate Petrochemicals, Kuwait |
 |
EQUATE |
Construction |
Kuwait |
2007 |
| General Construction Contract, Offsite Works- Aromatics Project |
 |
KPPC |
Construction |
Kuwait |
2011 |
| Mechanical Works - New AGRP/AGRP Revamp Project at MAA Refinery |
 |
Tecnimont/KNPC |
Construction |
Kuwait |
2016 |
| Heavy Aromatics Storage & Export |
 |
KPPC |
Construction |
Kuwait |
2010 |
| Aromatics on plot project, Above Ground Piping Works |
 |
SKEC/KPPC |
Construction |
Kuwait |
2008 |
| Heavy Aromatics Project - Offshore Portion |
 |
Hyundai/KPPC |
Construction |
Kuwait |
2010 |
| Waste Water Recycling Plant & Storm Water Purification Unit |
 |
EQUATE |
Construction |
Kuwait |
2015 |
| Replacement of Existing Hydraulic Governor by Electronic Governor of Wet Gas Compressors Drive Turbine (C-20-101/201 ST) at Delayed Coker (Unit-20) in MAB Refinery |
 |
KNPC |
Construction |
Kuwait |
2013 |
| Building New Gathering Centre GC-24 At Sabriyah Field North Kuwait |
 |
SKEC/KOC |
Construction |
Kuwait |
2009 |
| Construction of Vacuum Rerun Revamp Unit at Mina Abdullah Refinery, Kuwait National Petroleum Company, Kuwait. |
 |
Technip/KNPC |
Construction |
Kuwait |
2005 |
| GC-28 Capacity Expansion Project, Mechanical & Piping Works ,KOC |
 |
Technicas Reunidas/KOC |
Construction |
Kuwait |
2009 |
| New ATK Merox Unit, MAB Refinery |
 |
TOYO India/KNPC |
Construction |
Kuwait |
2005 |
| KNPC New Oil Pier Project Instrumentation Works |
 |
Hyundai/KNPC |
Construction |
Kuwait |
2003 |
| Dry Gas Seal Retrofitting in Compressor C-14-101 & C-14-102 at Mina Abdulla Refinery. |
 |
Dan Trading/KNPC |
Construction |
Kuwait |
2011 |
| Replace Decoke Dilution Steam with MP Steam, Equate- Contract No. 4500002025 |
 |
EQUATE |
Construction |
Kuwait |
2011 |
| Operational Services of Petrol Filling Stations and Other LMD Facilities - North Area (A) |
 |
KNPC |
Operation & Maintenance |
Kuwait |
2025 |
| Operational Services of Petrol Filling Stations and Other LMD Facilities - South Area (C) |
 |
KNPC |
Operation & Maintenance |
Kuwait |
2025 |
| Retubing of L.P heaters no. (2,3) tube bundle for steam turbines at doha west power & water distillation station |
 |
MEW |
Operation & Maintenance |
Kuwait |
2024 |
| Comprehensive Maintenance of Gas Facilities in all KOC Areas |
 |
KOC |
Operation & Maintenance |
Kuwait |
2024 |
| Maintenance Services of Production Facilities For South Kuwait Areas |
 |
KOC |
Operation & Maintenance |
Kuwait |
2024 |
| Short-Term Operations Assistance Services For KOC Facilities In South Kuwait Areas |
 |
KOC |
Operation & Maintenance |
Kuwait |
2019 |
| Insulation Maintenance Works |
 |
EQUATE |
Operation & Maintenance |
Kuwait |
2019 |
| Provision of Special Coating Services- Contract No. JO/SC248R/PO10 |
 |
JO |
Operation & Maintenance |
Kuwait |
2015 |
| Service Contract For Flowserve Pumps at PMP - Contract No.JO/SC298/MM11 |
 |
JO |
Operation & Maintenance |
Kuwait |
2017 |
| Maintenance Services of Production Facilities for South Kuwait Areas. |
 |
KOC |
Operation & Maintenance |
Kuwait |
2016 |
| Mechanical Maintenance Services at Mina Abdulla Refinery |
 |
KNPC |
Operation & Maintenance |
Kuwait |
2015 |
| Rotating & Reciprocating Machines Overhauling – TA-2014 |
 |
PIC |
Operation & Maintenance |
Kuwait |
2014 |
| Turnaround February 2010- Gulf Petrochemical Industries Company |
 |
GPIC |
Operation & Maintenance |
Kuwait |
2010 |
| Five Years Mechanical Maintenance Contract at MAB Refinery |
 |
KNPC |
Operation & Maintenance |
Kuwait |
2004 |
| Five Years Mechanical Maintenance Contract at MAB Refinery |
 |
KNPC |
Operation & Maintenance |
Kuwait |
1999 |
| Operation and Maintenance of Salt and Chlorine Plant. |
 |
Ahlia Projects |
Operation & Maintenance |
Kuwait |
2002 |
| Maintenance of Salt and Chlorine Plant. |
 |
Ahlia Projects |
Operation & Maintenance |
Kuwait |
2004 |
| Maintenance of Salt and Chlorine Plant. |
 |
Ahlia Projects |
Operation & Maintenance |
Kuwait |
2006 |
| Rotating & Reciprocating Machines Work -TA-2012 |
 |
PIC |
Operation & Maintenance |
Kuwait |
2012 |
| Rotating & Reciprocating Machines Work -TA-2009 |
 |
PIC |
Operation & Maintenance |
Kuwait |
2009 |
| Rep. of LP Carbamate Condensers, HP Carbamate Pumps & installation of Modified Internals of Rectifying Column |
 |
PIC |
Operation & Maintenance |
Kuwait |
2009 |
| Retubing of Heat Exchanger for RMP - GRTA shutdown April/May 2009 at Mina Al-Ahmadi Refinery |
 |
KNPC |
Operation & Maintenance |
Kuwait |
2009 |
| Overhauling of critical Rotating Equipments(SD/5/2006) |
 |
PIC |
Operation & Maintenance |
Kuwait |
2006 |
| Rotating Equipment Overhauling (MM/5/2004) |
 |
PIC |
Operation & Maintenance |
Kuwait |
2004 |
| High Pressure Vessels Overhauling & Cleaning |
 |
PIC |
Operation & Maintenance |
Kuwait |
2004 |
| Rotating Equipment Overhauling(MM/3/2003) |
 |
PIC |
Operation & Maintenance |
Kuwait |
2003 |
| Gas Seal Retrofit Project at BS-140 & BS- 150,Dresser Rand |
 |
Dresser Rand/KOC |
Operation & Maintenance |
Kuwait |
2003 |
| Retrofit of Gas Seal Systems at BS-140 & BS-150, Thermodyn |
 |
Thermodyn/KOC |
Operation & Maintenance |
Kuwait |
2004 |
| Engineering design service for JPF-5 project. |
 |
KNPC |
Engineering |
Kuwait |
2024 |
| Consultancy Services for Enhancement Of Desalinated Water Import and Storage Facilities at MAA Refinery. |
 |
KNPC |
Engineering |
Kuwait |
2023 |
| CA/3945/CNSL - Consultancy for Engineering Services at Mina-Al-Ahmadi refinery. |
 |
KNPC |
Engineering |
Kuwait |
2020 |
| Technical Support Services for Quality Assurance Department at Mina Abdulla Refinery |
 |
KNPC |
Engineering |
Kuwait |
2021 |
| Installation of multi - point smokeless high pressure flare at 14 south and east Kuwait GCs |
 |
KOC/Mushrif |
Engineering |
Kuwait |
2014 |
| Installation of new effluent water disposal system at GC-15, GC-25 and injection pump at CIPF |
 |
KOC/Bader AlMulla |
Engineering |
Kuwait |
2012 |
| Replacement of HIC Affected Non Nace Separator and gas Scrubbers at SEK GC’s 9,10,20 & 22-KOC |
 |
KOC/MECC |
Engineering |
Kuwait |
2018 |
| Replacement of 40” HP Gas Transmission Pipeline from GCMB to LPG Plant |
 |
KOC/Al-Khadda |
Engineering |
Kuwait |
2014 |
| Installation of new gas pipelines replacement / Rerouting of existing gas pipeline at MAGWA (S&EK) |
 |
KOC/Combined group |
Engineering |
Kuwait |
2014 |
| Construction of Maintenance of Mina Abdullah WDC II |
 |
MEW/Ahamadiah Cont.& Trad. Co |
Engineering |
Kuwait |
2010 |
| Replacement of the 16” Condensate Line With New 20” Line From GCMB Manifold to MAA-02 Manifold |
 |
KOC/KCCE |
Engineering |
Kuwait |
2012 |
| Updation (As-built ) of Engineering Drawings Part1-(Requirement As per CRIC Recommendation - 58”Shuaiba Refinery –Oil Pier & Tank Farm). |
 |
KNPC |
Engineering |
Kuwait |
2009 |
| Consultancy Service for Updating Drawings for MAB Refinery |
 |
KNPC |
Engineering |
Kuwait |
2006 |
| Updating As Built Drawings |
 |
KOC |
Engineering |
Kuwait |
2012 |
| Construction of high pressure flowlines and associated works for Jurassic wells at north Kuwait areas - section ii (re-routing of existing pipelines for new subiya highway) |
 |
KOC/Arabi Enertech |
Engineering |
Kuwait |
2012 |
| Replacement of Crude Transit line from GC-09 to CMM |
 |
KOC/MECC |
Engineering |
Kuwait |
2009 |
| Contract No: 33015 Installation of Air Assisted Flare Stacks in GC- 17, 27, 28 & BS170. |
 |
KOC/Ahamadiah Cont.& Trad. Co |
Engineering |
Kuwait |
2010 |
| Replacement of Dual Tank at GC-04 & Dry Tank at GC-21. |
 |
KOC/Arabi Enertech |
Engineering |
Kuwait |
2012 |
| Civil Engineering Services for New GC-16. |
 |
KOC/Saipem |
Engineering |
Kuwait |
2011 |
| Contract No:11050207 Construction of New Export Transit Pipeline from New BS-171 to AGRP at MAA. |
 |
KOC/MECC |
Engineering |
Kuwait |
2011 |
| Contract No: 12050835 Replacement of 16’’Eocene Crude Supply from Wafra Burgan Manifold. |
 |
KOC/Consolidated Cont Co. |
Engineering |
Kuwait |
2012 |
| Improvement of ESD system at GCs 17, 27, & 28 and Isolation Capabilities at GCs 27 & 28 at West Kuwait. |
 |
KOC/Al-Khadda |
Engineering |
Kuwait |
2008 |
| Improvement to Crude Sampling Points at all South &East Kuwait Gathering Centers . |
 |
KOC/MECC |
Engineering |
Kuwait |
2007 |
| Replacement of Eight Plate Heat Exchanger at GC-04 |
 |
KOC/MECC |
Engineering |
Kuwait |
2012 |
| Engineering and HAZOP Study for Installation of Controls to maintain fixed split of Liquid phase flow |
 |
KOC/Mushrif |
Engineering |
Kuwait |
2005 |
| New 56" Spur Line for MAA Crude Pump |
 |
KOC/SOS |
Engineering |
Kuwait |
2006 |
| Engineering Works for GC-16 LP/HP/Test Separator and Desanding Skid. |
 |
KOC/Bader AlMulla |
Engineering |
Kuwait |
2012 |
| Fire Protection System for KOC assets in North Kuwait. |
 |
KOC/IMCO |
Engineering |
Kuwait |
2007 |
| Effluent Water Pumping System in GC 17, 27 & 28 |
 |
KOC/United Gulf Const Co. |
Engineering |
Kuwait |
2010 |
| Consultancy Services for As-built Documentation & Electronic Engineering Document Management System(EDDMS) for Boiler & Associated Facilities at MAA refinery. |
 |
KNPC |
Engineering |
Kuwait |
2021 |
| Consultancy Services for the FEED for improvement of Sanitary Sewerage system and associated works in MAA Refinery |
 |
KNPC |
Engineering |
Kuwait |
2020 |
| Consultancy Service To Replace R-22 Refrigerant In South Storage At Gas Plant In MAA Refinery. |
 |
KNPC |
Engineering |
Kuwait |
2019 |
| Upgradation of Gas & Condensate Network at EK Area-1. |
 |
KOC/Alghanim |
Engineering |
Kuwait |
2018 |
| 3D Laser Scanning Survey for Installation of New Desalter Train at GC-09, GC-10, GC-19 & GC-21(NPCC). |
 |
KOC/Alkhorayef |
Engineering |
Kuwait |
2018 |
| Conversion of P&ID to SP P&ID. |
 |
CYBERMAK |
Engineering |
Kuwait |
2018 |
| R-22 Refrigerant in South Storage at Gas Plant in MAA Refinery. |
 |
KNPC |
Engineering |
Kuwait |
2018 |
| Water Management at GC 9,10, 20, 22. |
 |
KOC/MECC |
Engineering |
Kuwait |
2017 |
| Upgradation of Gas & Condensate Network at EK-2. |
 |
KOC/MECC |
Engineering |
Kuwait |
2017 |
| Upgradation of Gas & Condensate Network at South Kuwait. |
 |
KOC/KCCEC |
Engineering |
Kuwait |
2017 |
| Additional 14" Mogas IRT from MAA To SHU and Additional Inter Connecting 12" & 14" Line at Tankage A. |
 |
KNPC/HOT |
Engineering |
Kuwait |
2017 |
| Replacement of Old Substation in West Kuwait Area Including TOPO & HSE Studies. |
 |
KOC/O&G |
Engineering |
Kuwait |
2017 |
| New Desalinated Water line from Shuaiba Power Plant to MAB Tie-in. |
 |
KNPC/Arabi Enertech |
Engineering |
Kuwait |
2017 |
| Construction of remote Header Manifold in South and East Kuwait Areas. |
 |
KOC/Alghanim |
Engineering |
Kuwait |
2017 |
| JLO Blending Manifold. |
 |
KOC/KCCEC |
Engineering |
Kuwait |
2017 |
| Jurassic Production facilities Off-Plot Works at North Kuwait Areas - Section-2, 3 & 5. |
 |
KOC/Combined group |
Engineering |
Kuwait |
2017 |
| Debottlenecking of GC-17. |
 |
KOC/HEISCO |
Engineering |
Kuwait |
2016 |
| Replacement of Existing Black Oil Piping to white Oil Piping. |
 |
KOC/Arabi Enertech |
Engineering |
Kuwait |
2016 |
| New 12" HP Natural Gas Pipeline Inside MAB Refinery. |
 |
KNPC/KCCEC |
Engineering |
Kuwait |
2016 |
| Desalinated water supply. |
 |
KOC/Arabi Enertech |
Engineering |
Kuwait |
2016 |
| Study of existing seawater network in MAA refinery to ensure operational and mechanical reliability. |
 |
KNPC |
Engineering |
Kuwait |
2016 |
| Design and Detail Engineering works for Ummniqa. |
 |
KOC/SCHLUMBERGER |
Engineering |
Kuwait |
2016 |
| Replacement of Non-NACE HIC affected separator at GC 01, 03, 04, 06 & 08. |
 |
KOC/MECC |
Engineering |
Kuwait |
2016 |
| EPF P3G work order 08. |
 |
KOC/MECC |
Engineering |
Kuwait |
2016 |
| New GC-16 Train-3 feed. |
 |
KOC/Alkhorayef |
Engineering |
Kuwait |
2016 |
| Replacement of elevators in MAB refinery. |
 |
KNPC/KCCE |
Engineering |
Kuwait |
2016 |
| Installation of new gas pipelines and replacement / re-routing of existing gas pipelines at Burgan. |
 |
KOC/Finesco |
Engineering |
Kuwait |
2015 |
| Dharif Water Injection Pilot Plant |
 |
KOC/Finesco |
Engineering |
Kuwait |
2010 |
| Installation and Replacement of Crude Transit lines in SEK Areas. |
 |
KOC/HOT |
Engineering |
Kuwait |
2009 |
| Improvement to Header ESD System at SEK GCs 3, 4, 6, 7, 8 & 28. |
 |
KOC/Mushrif |
Engineering |
Kuwait |
2007 |
| Construction Main Intake (20 MW) New Elevated A-27 Substation and Improve SEK Fields Power Distribution Network. |
 |
KOC/HEISCO |
Engineering |
Kuwait |
2011 |
| Engineering for Installation of New Pumps & Piping modification for Firefighting systems (8 locations) |
 |
KOC/Al-Khadda |
Engineering |
Kuwait |
2010 |
| New 11 KV (72 MW) main bulk intake substations at Raudhation 'D' (RA-D) and Sabriya 'B' (SA-B) area |
 |
KOC/O&G |
Engineering |
Kuwait |
2013 |
| HP darin system |
 |
JO/Bader AlMulla |
Engineering |
Kuwait |
2005 |
| Construction of Two Eocene Tanks and Two Chemical Tanks at MGC |
 |
JO/CCC |
Engineering |
Kuwait |
2011 |
| Clean and Recycle Oily Viscous Liquid (OVL) Service |
 |
JO/PIKA |
Engineering |
Kuwait |
2009 |
| New Fire fighting system for Main Gathering Center |
 |
JO |
Engineering |
Kuwait |
1998 |
| Brackish water distribution network piping |
 |
JO |
Engineering |
Kuwait |
1999 |
| Upgrading of fire fighting system at mina saudi |
 |
SAC/Alrobaya |
Engineering |
Kuwait |
2014 |
| SAC-423 Construction of new electrical substations no. 2, 3, & 5 at mina-saud, Kuwait. |
 |
SAC/Alrobaya |
Engineering |
Kuwait |
2014 |
| Mina Saud Pipeline Integrity-Upgrade Relocation of manifold. |
 |
SAC/NBTC |
Engineering |
Kuwait |
2012 |
| MEW/MC/4181-2010/2011 – Construction & Maintenance of Mina Abdullah WDC II |
 |
MEW |
Engineering |
Kuwait |
2011 |
| C-933/C-937 - De-Mineralization Plant at Doha East & Az-Zour South Power Generation & Waster Distillation Plant |
 |
MEW |
Engineering |
Kuwait |
2013 |
| Stress Analysis from Boiler outlet to Turbine inlet Piping |
 |
PIC |
Engineering |
Kuwait |
2013 |
| Replacing of Trip Switches with Smart Transmitters |
 |
PIC |
Engineering |
Kuwait |
2014 |
| Engineering Services of New Carbamate Transfer Line between urea plants (PA-2121) |
 |
PIC |
Engineering |
Kuwait |
2010 |
| Jaber Al-Ahmad Al-Jaber Al Sabah Hospital |
 |
MOH/Ecotherm W.L.L |
Engineering |
Kuwait |
2012 |
| Intelligent P&ID Conversion in Plant Space P&ID Systems |
 |
EQUATE |
Engineering |
Kuwait |
2008 |
| Alternate PSV System |
 |
EQUATE |
Engineering |
Kuwait |
2014 |
| Purification Bed lead and lag arrangement |
 |
EQUATE |
Engineering |
Kuwait |
2014 |
| 600 MTPD CO2 plant at Shuaiba industrial area (Engineering & PMC) |
 |
Green Carbon |
Engineering |
Kuwait |
2010 |
| 300 MTPD CO2 Recovery plant |
 |
Gulf cryo |
Engineering |
Kuwait |
2013 |
| Engineering Services for the steam distribution network stress analysis and isometric drawing. |
 |
Ecotherm |
Engineering |
Kuwait |
2012 |
| Stone Wool Plant (Engineering & PMC) |
 |
FSIC |
Engineering |
Kuwait |
2012 |
| Checking the integrity of existing foundations for plant revamping |
 |
KIMMCO |
Engineering |
Kuwait |
2001 |
| Design of structural modifications for the new fore hearth, forming and Fiberizer machine |
 |
KIMMCO |
Engineering |
Kuwait |
2001 |
| Detail Engineering Works for Esmeralds Refinery Rehabilitions Phase 2 Projects |
 |
Petroecuador / GEA Westfalia Germany. |
Engineering |
Kuwait |
2011 |
No Projects. |