Engineering, Procurement And Construction and Commissioning of Debottlenecking of Coker Unit (U-20) MAB |
|
KNPC |
EPC |
Kuwait |
2023 |
Procurement, Construction And Commissioning Of Automatic Backwash Filter Package (1 Nos.) On 72 Inch Sea Water Supply Lines At MAA Refinery |
|
KNPC |
EPC |
Kuwait |
2023 |
Replacement Of Dosing And Wash Water Make-Up Pumps (33 Nos.) / Travelling Water Screen (Ts-73-101 A/B)& Screen Wash Pumps (P-73-106 A&B) / Overhead Gas After Cooler (E-12-122) In MAB Refinery |
|
KNPC |
EPC |
Kuwait |
2022 |
Engineering, Procurement, Construction and Commissioning of KOC Molten Sulphur Handling Facilities at KNPC MAA Refinery |
|
KNPC |
EPC |
Kuwait |
2020 |
EPC and Commissioning of the Balance Activities for New AGRP Project at MAA Refinery |
|
KNPC |
EPC |
Kuwait |
2019 |
Engineering, Procurement and Construction of New Flare Gas Recovery Unit (Unit- 49) at MAB Refinery |
|
KNPC |
EPC |
Kuwait |
2018 |
Replacement of Valves in MAB Refinery |
|
KNPC |
EPC |
Kuwait |
2017 |
Replacement of HIC affected Non-NACE Separators and Gas Scrubbers at SEK GCs 1,6,8 & 11 |
|
KOC |
EPC |
Kuwait |
2017 |
Replacement of the HIC affected equipment in SK GC's 3,4,7,8 and 21 |
|
KOC |
EPC |
Kuwait |
2017 |
Revamp of MAA Burney for Recovery and Smokeless Operation |
|
KNPC |
EPC |
Kuwait |
2017 |
Design , Fabrication & Erection of New Incinerator Stacks (2 Nos) of 110M height at TGTU (Unit 24) at MAB Refinery |
|
KNPC |
EPC |
Kuwait |
2013 |
Engineering , Procurement & Construction of New Flare Gas Recovery Unit (Unit- 105) At Mina Ahmadi refinery |
|
KNPC |
EPC |
Kuwait |
2013 |
Facilities for Moisture Control & Dehazing of Gas Oil, Mina Abdulla, KNPC |
|
KNPC |
EPC |
Kuwait |
2008 |
Upgrading of MCO (Medium Crude Oil) Incoming Manifold at GC -27 |
|
KOC |
EPC |
Kuwait |
2013 |
EPC for Revamp of Potable Water Network at MAB Refinery |
|
KNPC |
EPC |
Kuwait |
2009 |
Installation of Gravity Drain System in GCs 17,27 & 28 |
|
KOC |
EPC |
Kuwait |
2010 |
Replacement of Existing CS piping by PTFE Lined CS piping-Shuaiba Refinery |
|
KNPC |
EPC |
Kuwait |
2008 |
Improving Maintainability of Trim Coolers & Desalter Dehydration Heaters at GC - 27 & 28 West Kuwait |
|
KOC |
EPC |
Kuwait |
2010 |
Extension of Glass Factory, EPC Contract. |
|
Gulf Glass Manufacturing Company |
EPC |
Kuwait |
2002 |
Construction of Marrat Water Flood Pilot Plant, Kuwait Oil Company |
|
Al Khorayef/KOC |
EPC |
Kuwait |
2006 |
Replacement of Fire Protection System of Mina Crude Pump units 1 & 2 |
|
KOC |
EPC |
Kuwait |
2010 |
Construction of Wara Water Flood Pilot Plant, Kuwait Oil Company |
|
Al Khorayef/KOC |
EPC |
Kuwait |
2005 |
Engg, Procurement and Construction of 7 Nos of 1000 Cu.m of Lube Oil Storage tanks |
|
Kuwait Lube Oil Company |
EPC |
Kuwait |
2002 |
Dry Gas Seal System Retrofitting For Compressors C-84-100 & C-84-200 at MAA Refinery |
|
Dan Trading/KNPC |
Construction |
Kuwait |
2022 |
EU1/EU2 C2 OSBL Line Civil Revamp Project |
|
EQUATE |
Construction |
Kuwait |
2022 |
MEI Works for the Process Sub-Area of the EPC&C of Gas Train 5 Project at MAA Refinery |
|
Tecnicas Reunidas/ KNPC |
Construction |
Kuwait |
2022 |
SP-1, SMP2 & 3 Structural, Mechanical and Piping Works, CFP MAB Refinery |
|
HHI/KNPC |
Construction |
Kuwait |
2019 |
Construction of Mechanical, Structure, Piping, Electrical, Instrumentation & Telecom Works for New Gathering Center, GC-29 in North Kuwait |
|
Petrofac/KOC |
Construction |
Kuwait |
2018 |
Prefabrication of Piping Spool for LFHO project, KOC |
|
Petrofac/KOC |
Construction |
Kuwait |
2017 |
Pre Commissioning and Commissioning Activities Of Boiler No. 8 and Associated Facilities For NAGRP Project at MAA Refinery |
|
KCC/KNPC |
Construction |
Kuwait |
2016 |
Installation of New Compressor at GC-7, GC-8 & GC-21 |
|
Saipem/KOC |
Construction |
Kuwait |
2012 |
EBSM Project, ME&I Works, OL2K Project, The Kuwait Styrene Company (TKSC). |
|
The Kuwait Styrene Company (TKSC) |
Construction |
Kuwait |
2008 |
Olefins – OL2K, Mechanical Infrastructure , M1 package, Equate Petrochemicals, Kuwait |
|
EQUATE |
Construction |
Kuwait |
2007 |
General Construction Contract, Offsite Works- Aromatics Project |
|
KPPC |
Construction |
Kuwait |
2011 |
Mechanical Works - New AGRP/AGRP Revamp Project at MAA Refinery |
|
Tecnimont/KNPC |
Construction |
Kuwait |
2016 |
Heavy Aromatics Storage & Export |
|
KPPC |
Construction |
Kuwait |
2010 |
Aromatics on plot project, Above Ground Piping Works |
|
SKEC/KPPC |
Construction |
Kuwait |
2008 |
Heavy Aromatics Project - Offshore Portion |
|
Hyundai/KPPC |
Construction |
Kuwait |
2010 |
Waste Water Recycling Plant & Storm Water Purification Unit |
|
EQUATE |
Construction |
Kuwait |
2015 |
Replacement of Existing Hydraulic Governor by Electronic Governor of Wet Gas Compressors Drive Turbine (C-20-101/201 ST) at Delayed Coker (Unit-20) in MAB Refinery |
|
KNPC |
Construction |
Kuwait |
2013 |
Building New Gathering Centre GC-24 At Sabriyah Field North Kuwait |
|
SKEC/KOC |
Construction |
Kuwait |
2009 |
Construction of Vacuum Rerun Revamp Unit at Mina Abdullah Refinery, Kuwait National Petroleum Company, Kuwait. |
|
Technip/KNPC |
Construction |
Kuwait |
2005 |
GC-28 Capacity Expansion Project, Mechanical & Piping Works ,KOC |
|
Technicas Reunidas/KOC |
Construction |
Kuwait |
2009 |
New ATK Merox Unit, MAB Refinery |
|
TOYO India/KNPC |
Construction |
Kuwait |
2005 |
KNPC New Oil Pier Project Instrumentation Works |
|
Hyundai/KNPC |
Construction |
Kuwait |
2003 |
Dry Gas Seal Retrofitting in Compressor C-14-101 & C-14-102 at Mina Abdulla Refinery. |
|
Dan Trading/KNPC |
Construction |
Kuwait |
2011 |
Replace Decoke Dilution Steam with MP Steam, Equate- Contract No. 4500002025 |
|
EQUATE |
Construction |
Kuwait |
2011 |
Short-Term Operations Assistance Services For KOC Facilities In South Kuwait Areas |
|
KOC |
Operation & Maintenance |
Kuwait |
2019 |
Insulation Maintenance Works |
|
EQUATE |
Operation & Maintenance |
Kuwait |
2019 |
Provision of Special Coating Services- Contract No. JO/SC248R/PO10 |
|
JO |
Operation & Maintenance |
Kuwait |
2015 |
Service Contract For Flowserve Pumps at PMP - Contract No.JO/SC298/MM11 |
|
JO |
Operation & Maintenance |
Kuwait |
2017 |
Maintenance Services of Production Facilities for South Kuwait Areas. |
|
KOC |
Operation & Maintenance |
Kuwait |
2016 |
Mechanical Maintenance Services at Mina Abdulla Refinery |
|
KNPC |
Operation & Maintenance |
Kuwait |
2015 |
Rotating & Reciprocating Machines Overhauling – TA-2014 |
|
PIC |
Operation & Maintenance |
Kuwait |
2014 |
Turnaround February 2010- Gulf Petrochemical Industries Company |
|
GPIC |
Operation & Maintenance |
Kuwait |
2010 |
Five Years Mechanical Maintenance Contract at MAB Refinery |
|
KNPC |
Operation & Maintenance |
Kuwait |
2004 |
Five Years Mechanical Maintenance Contract at MAB Refinery |
|
KNPC |
Operation & Maintenance |
Kuwait |
1999 |
Operation and Maintenance of Salt and Chlorine Plant. |
|
Ahlia Projects |
Operation & Maintenance |
Kuwait |
2002 |
Maintenance of Salt and Chlorine Plant. |
|
Ahlia Projects |
Operation & Maintenance |
Kuwait |
2004 |
Maintenance of Salt and Chlorine Plant. |
|
Ahlia Projects |
Operation & Maintenance |
Kuwait |
2006 |
Rotating & Reciprocating Machines Work -TA-2012 |
|
PIC |
Operation & Maintenance |
Kuwait |
2012 |
Rotating & Reciprocating Machines Work -TA-2009 |
|
PIC |
Operation & Maintenance |
Kuwait |
2009 |
Rep. of LP Carbamate Condensers, HP Carbamate Pumps & installation of Modified Internals of Rectifying Column |
|
PIC |
Operation & Maintenance |
Kuwait |
2009 |
Retubing of Heat Exchanger for RMP - GRTA shutdown April/May 2009 at Mina Al-Ahmadi Refinery |
|
KNPC |
Operation & Maintenance |
Kuwait |
2009 |
Overhauling of critical Rotating Equipments(SD/5/2006) |
|
PIC |
Operation & Maintenance |
Kuwait |
2006 |
Rotating Equipment Overhauling (MM/5/2004) |
|
PIC |
Operation & Maintenance |
Kuwait |
2004 |
High Pressure Vessels Overhauling & Cleaning |
|
PIC |
Operation & Maintenance |
Kuwait |
2004 |
Rotating Equipment Overhauling(MM/3/2003) |
|
PIC |
Operation & Maintenance |
Kuwait |
2003 |
Gas Seal Retrofit Project at BS-140 & BS- 150,Dresser Rand |
|
Dresser Rand/KOC |
Operation & Maintenance |
Kuwait |
2003 |
Retrofit of Gas Seal Systems at BS-140 & BS-150, Thermodyn |
|
Thermodyn/KOC |
Operation & Maintenance |
Kuwait |
2004 |
Consultancy Services for Enhancement Of Desalinated Water Import and Storage Facilities at MAA Refinery. |
|
KNPC |
Engineering |
Kuwait |
2023 |
CA/3945/CNSL - Consultancy for Engineering Services at Mina-Al-Ahmadi refinery. |
|
KNPC |
Engineering |
Kuwait |
2020 |
Technical Support Services for Quality Assurance Department at Mina Abdulla Refinery |
|
KNPC |
Engineering |
Kuwait |
2021 |
Installation of multi - point smokeless high pressure flare at 14 south and east Kuwait GCs |
|
KOC/Mushrif |
Engineering |
Kuwait |
2014 |
Installation of new effluent water disposal system at GC-15, GC-25 and injection pump at CIPF |
|
KOC/Bader AlMulla |
Engineering |
Kuwait |
2012 |
Replacement of HIC Affected Non Nace Separator and gas Scrubbers at SEK GC’s 9,10,20 & 22-KOC |
|
KOC/MECC |
Engineering |
Kuwait |
2018 |
Replacement of 40” HP Gas Transmission Pipeline from GCMB to LPG Plant |
|
KOC/Al-Khadda |
Engineering |
Kuwait |
2014 |
Installation of new gas pipelines replacement / Rerouting of existing gas pipeline at MAGWA (S&EK) |
|
KOC/Combined group |
Engineering |
Kuwait |
2014 |
Construction of Maintenance of Mina Abdullah WDC II |
|
MEW/Ahamadiah Cont.& Trad. Co |
Engineering |
Kuwait |
2010 |
Replacement of the 16” Condensate Line With New 20” Line From GCMB Manifold to MAA-02 Manifold |
|
KOC/KCCE |
Engineering |
Kuwait |
2012 |
Updation (As-built ) of Engineering Drawings Part1-(Requirement As per CRIC Recommendation - 58”Shuaiba Refinery –Oil Pier & Tank Farm). |
|
KNPC |
Engineering |
Kuwait |
2009 |
Consultancy Service for Updating Drawings for MAB Refinery |
|
KNPC |
Engineering |
Kuwait |
2006 |
Updating As Built Drawings |
|
KOC |
Engineering |
Kuwait |
2012 |
Construction of high pressure flowlines and associated works for Jurassic wells at north Kuwait areas - section ii (re-routing of existing pipelines for new subiya highway) |
|
KOC/Arabi Enertech |
Engineering |
Kuwait |
2012 |
Replacement of Crude Transit line from GC-09 to CMM |
|
KOC/MECC |
Engineering |
Kuwait |
2009 |
Contract No: 33015 Installation of Air Assisted Flare Stacks in GC- 17, 27, 28 & BS170. |
|
KOC/Ahamadiah Cont.& Trad. Co |
Engineering |
Kuwait |
2010 |
Replacement of Dual Tank at GC-04 & Dry Tank at GC-21. |
|
KOC/Arabi Enertech |
Engineering |
Kuwait |
2012 |
Civil Engineering Services for New GC-16. |
|
KOC/Saipem |
Engineering |
Kuwait |
2011 |
Contract No:11050207 Construction of New Export Transit Pipeline from New BS-171 to AGRP at MAA. |
|
KOC/MECC |
Engineering |
Kuwait |
2011 |
Contract No: 12050835 Replacement of 16’’Eocene Crude Supply from Wafra Burgan Manifold. |
|
KOC/Consolidated Cont Co. |
Engineering |
Kuwait |
2012 |
Improvement of ESD system at GCs 17, 27, & 28 and Isolation Capabilities at GCs 27 & 28 at West Kuwait. |
|
KOC/Al-Khadda |
Engineering |
Kuwait |
2008 |
Improvement to Crude Sampling Points at all South &East Kuwait Gathering Centers . |
|
KOC/MECC |
Engineering |
Kuwait |
2007 |
Replacement of Eight Plate Heat Exchanger at GC-04 |
|
KOC/MECC |
Engineering |
Kuwait |
2012 |
Engineering and HAZOP Study for Installation of Controls to maintain fixed split of Liquid phase flow |
|
KOC/Mushrif |
Engineering |
Kuwait |
2005 |
New 56" Spur Line for MAA Crude Pump |
|
KOC/SOS |
Engineering |
Kuwait |
2006 |
Engineering Works for GC-16 LP/HP/Test Separator and Desanding Skid. |
|
KOC/Bader AlMulla |
Engineering |
Kuwait |
2012 |
Fire Protection System for KOC assets in North Kuwait. |
|
KOC/IMCO |
Engineering |
Kuwait |
2007 |
Effluent Water Pumping System in GC 17, 27 & 28 |
|
KOC/United Gulf Const Co. |
Engineering |
Kuwait |
2010 |
Consultancy Services for As-built Documentation & Electronic Engineering Document Management System(EDDMS) for Boiler & Associated Facilities at MAA refinery. |
|
KNPC |
Engineering |
Kuwait |
2021 |
Consultancy Services for the FEED for improvement of Sanitary Sewerage system and associated works in MAA Refinery |
|
KNPC |
Engineering |
Kuwait |
2020 |
Consultancy Service To Replace R-22 Refrigerant In South Storage At Gas Plant In MAA Refinery. |
|
KNPC |
Engineering |
Kuwait |
2019 |
Upgradation of Gas & Condensate Network at EK Area-1. |
|
KOC/Alghanim |
Engineering |
Kuwait |
2018 |
3D Laser Scanning Survey for Installation of New Desalter Train at GC-09, GC-10, GC-19 & GC-21(NPCC). |
|
KOC/Alkhorayef |
Engineering |
Kuwait |
2018 |
Conversion of P&ID to SP P&ID. |
|
CYBERMAK |
Engineering |
Kuwait |
2018 |
R-22 Refrigerant in South Storage at Gas Plant in MAA Refinery. |
|
KNPC |
Engineering |
Kuwait |
2018 |
Water Management at GC 9,10, 20, 22. |
|
KOC/MECC |
Engineering |
Kuwait |
2017 |
Upgradation of Gas & Condensate Network at EK-2. |
|
KOC/MECC |
Engineering |
Kuwait |
2017 |
Upgradation of Gas & Condensate Network at South Kuwait. |
|
KOC/KCCEC |
Engineering |
Kuwait |
2017 |
Additional 14" Mogas IRT from MAA To SHU and Additional Inter Connecting 12" & 14" Line at Tankage A. |
|
KNPC/HOT |
Engineering |
Kuwait |
2017 |
Replacement of Old Substation in West Kuwait Area Including TOPO & HSE Studies. |
|
KOC/O&G |
Engineering |
Kuwait |
2017 |
New Desalinated Water line from Shuaiba Power Plant to MAB Tie-in. |
|
KNPC/Arabi Enertech |
Engineering |
Kuwait |
2017 |
Construction of remote Header Manifold in South and East Kuwait Areas. |
|
KOC/Alghanim |
Engineering |
Kuwait |
2017 |
JLO Blending Manifold. |
|
KOC/KCCEC |
Engineering |
Kuwait |
2017 |
Jurassic Production facilities Off-Plot Works at North Kuwait Areas - Section-2, 3 & 5. |
|
KOC/Combined group |
Engineering |
Kuwait |
2017 |
Debottlenecking of GC-17. |
|
KOC/HEISCO |
Engineering |
Kuwait |
2016 |
Replacement of Existing Black Oil Piping to white Oil Piping. |
|
KOC/Arabi Enertech |
Engineering |
Kuwait |
2016 |
New 12" HP Natural Gas Pipeline Inside MAB Refinery. |
|
KNPC/KCCEC |
Engineering |
Kuwait |
2016 |
Desalinated water supply. |
|
KOC/Arabi Enertech |
Engineering |
Kuwait |
2016 |
Study of existing seawater network in MAA refinery to ensure operational and mechanical reliability. |
|
KNPC |
Engineering |
Kuwait |
2016 |
Design and Detail Engineering works for Ummniqa. |
|
KOC/SCHLUMBERGER |
Engineering |
Kuwait |
2016 |
Replacement of Non-NACE HIC affected separator at GC 01, 03, 04, 06 & 08. |
|
KOC/MECC |
Engineering |
Kuwait |
2016 |
EPF P3G work order 08. |
|
KOC/MECC |
Engineering |
Kuwait |
2016 |
New GC-16 Train-3 feed. |
|
KOC/Alkhorayef |
Engineering |
Kuwait |
2016 |
Replacement of elevators in MAB refinery. |
|
KNPC/KCCE |
Engineering |
Kuwait |
2016 |
Installation of new gas pipelines and replacement / re-routing of existing gas pipelines at Burgan. |
|
KOC/Finesco |
Engineering |
Kuwait |
2015 |
Dharif Water Injection Pilot Plant |
|
KOC/Finesco |
Engineering |
Kuwait |
2010 |
Installation and Replacement of Crude Transit lines in SEK Areas. |
|
KOC/HOT |
Engineering |
Kuwait |
2009 |
Improvement to Header ESD System at SEK GCs 3, 4, 6, 7, 8 & 28. |
|
KOC/Mushrif |
Engineering |
Kuwait |
2007 |
Construction Main Intake (20 MW) New Elevated A-27 Substation and Improve SEK Fields Power Distribution Network. |
|
KOC/HEISCO |
Engineering |
Kuwait |
2011 |
Engineering for Installation of New Pumps & Piping modification for Firefighting systems (8 locations) |
|
KOC/Al-Khadda |
Engineering |
Kuwait |
2010 |
New 11 KV (72 MW) main bulk intake substations at Raudhation 'D' (RA-D) and Sabriya 'B' (SA-B) area |
|
KOC/O&G |
Engineering |
Kuwait |
2013 |
HP darin system |
|
JO/Bader AlMulla |
Engineering |
Kuwait |
2005 |
Construction of Two Eocene Tanks and Two Chemical Tanks at MGC |
|
JO/CCC |
Engineering |
Kuwait |
2011 |
Clean and Recycle Oily Viscous Liquid (OVL) Service |
|
JO/PIKA |
Engineering |
Kuwait |
2009 |
New Fire fighting system for Main Gathering Center |
|
JO |
Engineering |
Kuwait |
1998 |
Brackish water distribution network piping |
|
JO |
Engineering |
Kuwait |
1999 |
Upgrading of fire fighting system at mina saudi |
|
SAC/Alrobaya |
Engineering |
Kuwait |
2014 |
SAC-423 Construction of new electrical substations no. 2, 3, & 5 at mina-saud, Kuwait. |
|
SAC/Alrobaya |
Engineering |
Kuwait |
2014 |
Mina Saud Pipeline Integrity-Upgrade Relocation of manifold. |
|
SAC/NBTC |
Engineering |
Kuwait |
2012 |
MEW/MC/4181-2010/2011 – Construction & Maintenance of Mina Abdullah WDC II |
|
MEW |
Engineering |
Kuwait |
2011 |
C-933/C-937 - De-Mineralization Plant at Doha East & Az-Zour South Power Generation & Waster Distillation Plant |
|
MEW |
Engineering |
Kuwait |
2013 |
Stress Analysis from Boiler outlet to Turbine inlet Piping |
|
PIC |
Engineering |
Kuwait |
2013 |
Replacing of Trip Switches with Smart Transmitters |
|
PIC |
Engineering |
Kuwait |
2014 |
Engineering Services of New Carbamate Transfer Line between urea plants (PA-2121) |
|
PIC |
Engineering |
Kuwait |
2010 |
Jaber Al-Ahmad Al-Jaber Al Sabah Hospital |
|
MOH/Ecotherm W.L.L |
Engineering |
Kuwait |
2012 |
Intelligent P&ID Conversion in Plant Space P&ID Systems |
|
EQUATE |
Engineering |
Kuwait |
2008 |
Alternate PSV System |
|
EQUATE |
Engineering |
Kuwait |
2014 |
Purification Bed lead and lag arrangement |
|
EQUATE |
Engineering |
Kuwait |
2014 |
600 MTPD CO2 plant at Shuaiba industrial area (Engineering & PMC) |
|
Green Carbon |
Engineering |
Kuwait |
2010 |
300 MTPD CO2 Recovery plant |
|
Gulf cryo |
Engineering |
Kuwait |
2013 |
Engineering Services for the steam distribution network stress analysis and isometric drawing. |
|
Ecotherm |
Engineering |
Kuwait |
2012 |
Stone Wool Plant (Engineering & PMC) |
|
FSIC |
Engineering |
Kuwait |
2012 |
Checking the integrity of existing foundations for plant revamping |
|
KIMMCO |
Engineering |
Kuwait |
2001 |
Design of structural modifications for the new fore hearth, forming and Fiberizer machine |
|
KIMMCO |
Engineering |
Kuwait |
2001 |
Detail Engineering Works for Esmeralds Refinery Rehabilitions Phase 2 Projects |
|
Petroecuador / GEA Westfalia Germany. |
Engineering |
Kuwait |
2011 |
No Projects. |